Windsor Dials, Windsor Berkshire

This project involved the strip-out of a two-storey, three-storey office building in Windsor, Berkshire, for refurbishment. The strip-out works included the removal of all fixtures, fittings, and finishes back to a clean shell, ready for refurbishment and installation of a new floor.

  • Duration: 3 Months
  • Client: Quartz
  • Project Type: Office Building Strip-Out

About this Project

The Windsor Dials project involved the comprehensive strip-out of a two- and three-storey office building in Windsor, Berkshire, in preparation for full refurbishment. The works included the removal of all internal fixtures, fittings, and finishes, returning the structure to a clean shell ready for a new floor installation. Careful planning ensured that building services and lifts remained operational and protected throughout the project. With a focus on safety and efficiency, a loading platform and protected external walkways were installed, allowing materials to be moved safely while minimising disruption to the surrounding area. The project was completed within a 12-week programme, maintaining high standards and ensuring minimal impact on local residents and the adjacent live railway station car park.

Windsor Dials
Windsor Dials

Challenges Faced:

  • Maintaining operational lifts while using them for waste removal

  • Protecting existing building services in active risers

  • Working within a live environment adjacent to a busy railway station car park

  • Ensuring minimal disruption to local residents and commuters

  • Managing logistics in a confined and high-footfall urban setting

Scope of Works

  • Full strip-out of two- and three-storey office spaces

  • Removal of all fixtures, fittings, and finishes back to shell condition

  • Maintenance and protection of operational lifts throughout the works

  • Installation of a protected external walkway for safe access and egress

  • Construction of a loading platform for efficient material handling

  • Protection of key building services to maintain operational safety systems

  • Completion of works within a 12-week programme