Northwick Park Hospital, Watford Road, Harrow
Full resfurbishment including, soft stripping, asbestos removal, ground works and drive through installation was done at the Northwick Park Hospital
- Duration: 30 Days
- Client: London North West University Healthcare NHS Trust
- Project Type: Full Refurbishment of the Pharmacy Drive Through
About this Project
This project involved the refurbishment and extension of the existing Pharmacy Drive-Through facility at Northwick Park Hospital. With a tight 30-day deadline and only five days for pre-construction planning, NCS undertook a fast-paced programme to strip out the old facility, manage asbestos removal, and construct a new extension. The works included M&E removals, groundworks, new blockwork construction, first fix installations, and the fabrication of bespoke doors, windows, and blinds. Despite the challenging timeframe, the new drive-through pharmacy was delivered on schedule to the satisfaction of the client.
Challenges Faced:
-
5-day lead-in time before commencing works
-
Tight 30-day programme
-
Asbestos-containing materials requiring removal
-
Maintaining hospital operations and access routes
-
Alteration of fire escape routes
-
Coordination of multiple trades and long working hours
Scope of Works
-
Full strip-out of the existing facility, including M&E, fixtures, and asbestos windows
-
Groundworks and shut-off of disabled parking for extension area
-
Reconfiguration of fire exit staircase
-
Blockwork construction for the new extension
-
First fix M&E: lighting, electrics, plumbing, HVAC, data, and security
-
Fabrication and installation of new windows, doors, and blinds
-
Completion and handover of the new Drive-Through Pharmacy within 30 days