Northwick Park Hospital, Watford Road, Harrow

Full resfurbishment including, soft stripping, asbestos removal, ground works and drive through installation was done at the Northwick Park Hospital 

  • Duration: 30 Days
  • Client: London North West University Healthcare NHS Trust
  • Project Type: Full Refurbishment of the Pharmacy Drive Through

About this Project

This project involved the refurbishment and extension of the existing Pharmacy Drive-Through facility at Northwick Park Hospital. With a tight 30-day deadline and only five days for pre-construction planning, NCS undertook a fast-paced programme to strip out the old facility, manage asbestos removal, and construct a new extension. The works included M&E removals, groundworks, new blockwork construction, first fix installations, and the fabrication of bespoke doors, windows, and blinds. Despite the challenging timeframe, the new drive-through pharmacy was delivered on schedule to the satisfaction of the client.

Northwick Park Hospital
Northwick Park Hospital

Challenges Faced:

  • 5-day lead-in time before commencing works

  • Tight 30-day programme

  • Asbestos-containing materials requiring removal

  • Maintaining hospital operations and access routes

  • Alteration of fire escape routes

  • Coordination of multiple trades and long working hours

Scope of Works

  • Full strip-out of the existing facility, including M&E, fixtures, and asbestos windows

  • Groundworks and shut-off of disabled parking for extension area

  • Reconfiguration of fire exit staircase

  • Blockwork construction for the new extension

  • First fix M&E: lighting, electrics, plumbing, HVAC, data, and security

  • Fabrication and installation of new windows, doors, and blinds

  • Completion and handover of the new Drive-Through Pharmacy within 30 days