203-213 Mare Street, London
The works involve the demolition of two two-storey buildings, the stripping out of an existing building, ground improvement works, and drainage diversion works.
- Duration: 3 Months
- Client: WorkSpace Ltd
- Project Type: Building Demolition & Strip-Out
About this Project
This central London project involved the demolition of two two-storey buildings and the strip-out of an additional structure in a high-density area surrounded by mixed-use properties. Ground improvement and drainage diversion works were also completed as part of the site preparation. With buildings dating back to the 1920s and 1930s, the project required careful planning and execution, particularly due to the variety of building materials and structural complexities.
Challenges Faced:
-
Dense urban environment with adjacent occupied buildings
-
Structures built from a mix of masonry, steel, and timber
-
Historical construction methods requiring delicate demolition
-
Ground improvement and drainage works in a confined space
Scope of Works
-
Demolition of two two-storey buildings
-
Strip-out of a four-storey 1925-built structure
-
Ground improvement and drainage diversion
-
Management of historical construction materials and layouts