DSV Warehouse, Stonehouse
Lane, West Thurrock, Essex
Full building and site removal & demolition in Essex – a long strategic job that took place within an operational logistics enviroment.
- Duration: Phased Works
- Client: Kier Eastern Ltd
- Project Type: Building & Site Removal\Demolition
About this Project
At the DSV Warehouse in West Thurrock, NCS undertook extensive industrial deconstruction works to clear and reconfigure large sections of the facility for a new drive-through loading process. The project included the removal of dock shelters, cladding, elevated structures, warehouse interiors, and a two-storey office building. Careful coordination ensured all equipment and redundant services were removed efficiently, with all materials cleared from site for safe disposal or recycling.
Challenges Faced:
-
Large-scale demolition within an operational logistics environment
-
Safe removal of elevated structures and steelwork
-
Coordinating removal of live and redundant services
-
Working around a vast footprint with multiple structural and surface systems
Scope of Works
-
Removal of 50 external dock shelters and internal dock levelers
-
Demolition of a two-storey office, slab, and foundations
-
Removal of insulated doors, bollards, barriers, and fire doors
-
Strip-out of internal warehouse fixtures and redundant systems
-
Deconstruction of external canopies and 1,791 sqm of cladding
-
Removal of cubica system, walkways, offices, and staircases
-
Demolition of the gatehouse and metal palisade fencing (383m)
-
Full site clearance and disposal of all waste and materials