Brunswick Apartments,
Southampton

Repair leakage and refurbish the rooms that had been damaged due to leakage, our remit was to return all rooms back to normal occupation.

  • Duration: 5 Months
  • Client: Empiric PLC
  • Project Type: Room Refurbishment

About this Project

The Brunswick Apartments project addressed long-standing water ingress issues in a student accommodation block consisting of an 11-storey tower and a three-floor podium. NCS removed the green roof and solar panels, applied a Prokol Pure Polyurea & Polyurethane coating with a 50-year warranty, and sealed all external curtain wall window systems. During the works, it was discovered that the building lacked a compliant fire strategy, leading to a full internal fire stopping programme and refurbishment of several water-damaged rooms.

Brunswick Apartments, Southampton
Brunswick Apartments, Southampton

Challenges Faced:

  • Long-term water ingress and interior damage

  • Accessing high-rise curtain wall systems without full scaffolding

  • Absence of a compliant fire strategy or fire stopping

  • Coordination of works across occupied student accommodation

Scope of Works

  • Removal and reinstatement of solar panels

  • Removal of existing green roof

  • Application of long-life waterproof liquid roof coating

  • External mastic sealing of curtain wall windows via cradle

  • Fire strategy survey and full fire stopping installation

  • Refurbishment of water-damaged rooms and finishes

  • Final photographic report provided via online portal